by State Representative Joe Gresko, (D)
121st Connecticut House District
Dear Neighbor,
The Connecticut Department of Transportation (CTDOT) announced a milling and resurfacing project for 0.66 miles of Route 1 in Stratford from Aug. 4th -11th.
The milling segment is anticipated to be performed Aug. 4th-8th while the resurfacing portion is slated for Aug. 8th-11th. This project is included in CTDOT’s 2022 Vendor Resurfacing Program.
Motorists can expect lane closures on Route 1 from Main Street Route 113 to Ferry Boulevard. The work schedule for this project is Sunday through Friday 7 p.m. to 5:30 a.m. Traffic control personnel and signing patterns will be utilized to guide drivers through the work zone.
Modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Please maintain a safe speed when driving in this area during the work.
As always, please feel free to reach out to me at the Capitol at 800-842-8267 or email me at [email protected].
Joseph P. Gresko